PROJECT DETAILS

Assignment Name:

Investigating Application and Adoption of Quality Standards for Agricultural Inputs

Name of Client:
Funded by:
Address:

CNFA
USAID
1828 L Street, NW Suite 710, Washington, D.C., USA

Duration of assignment (months):
Start date (month/year):
Completion date (month/year):

60 Days
March 2014
February 2016

Country:
Location within country:
Total No. of staff-months of the assignment:

Bangladesh
Khulna & Barisal Division
N/A

Narrative description of Project:

The Agro-Inputs Project (AIP) is a five-year project funded by the United States Agency for International Development (USAID) as a part of the US Government’s Feed the Future (FTF) Presidential Initiative.

  • AIP’s objective is to improve supply of quality agricultural inputs through input retailers. AIP identified and contextualized an indicator entitled “Number of farmers and others who have applied improved technologies or management practices as a result of USG assistance” from the list of FTF indicators to measure the progress at smallholder farmers, served by the retailers of AIP’s Agro-Inputs Retailers’ Network (AIRN). The current survey is an attempt to assess the progress by collecting data on application of improved technologies or management practices by smallholder farmers in relation to inputs and embedded services (input application methods in relation to production and personal safety) provided by the AIRN retailers.
  • The survey was quantitative in nature and face to face interview technique was used. The survey included the project working areas under Dhaka, Khulna and Barisal Divisions. The sample was 672 after considering 95% CL, 5% EL and 80% statistical power. The sample unit was selected in two stages. In the first stage, the required number of villages was selected from the database provided by the AIP through PPS (Probability Proportional to Size) method and then from each village required number of farmers was selected randomly.

Description of actual services provided by your staff within the assignment:

The assessment carried out by Innovision was aimed to identify the current status of the project in the selected regions in 16 districts of Khulna division (10 districts) and Barisal Division (six districts):

  • Briefing of the Research Associates & Tools Preparation
  • Field Assessment
  • Re-interview, debriefing and Report Submission
Related Projects